摘要
对日本三菱公司制造的河津电厂350MW机组快速甩负荷(FCB)功能的逻辑设计及存在问题进行分析,探讨了该机组FCB功能的设计思想,为大型机组实现FCB功能的可行性和必要性提供参考。
The logic design and existing problems in the fast cut back(FCB) function of 350 MW unit manufactured by Mitsubishi Corporation of Japan,and installed in Hejin Power Plant,have been analysed,and the design ideology of FCB function for 350 MW units manufactured by Mitsubishi Corporation, as well as the feasibility and necessity of realizing FCB function on large- capacity units, being investigated.
出处
《热力发电》
CAS
北大核心
2009年第1期83-86,共4页
Thermal Power Generation