摘要
以广州市鹤洞大桥为工程背景,着重探讨了混合体系(中跨为结合梁)斜拉桥施工控制中的几项重要技术的处理方法,工程实践证明这些方法是切实可行的。所述方法对其它体系斜拉桥也具有一定的参考价值。
This paper mainly discusses the methods dealing with several important techniques in the construction control of a mixed - system(including composite beam) cable - stayed bridge, based on the constructing of Hedong bridge of Guangzhou. The applicability of these methods was verified in the constructing practice. The methods here also provide good references for other cable - stayed bridges with large- span.
出处
《长沙交通学院学报》
1998年第2期55-61,共7页
Journal of Changsha Communications University
关键词
斜拉桥
结合梁
施工
控制
cable - stayed bridge
mixed - system
composite - beam
construction control