期刊文献+

提升SMT生产线效率的方法和措施 被引量:2

Methods and Measures for Improving SMT Line Efficiency
下载PDF
导出
摘要 SMT生产线要达到最大的产量,必须要考虑生产线的效率。贴片机是SMT生产线中的关键设备,因此提高贴片机的生产效率具有十分重要的意义。本文以环球贴片机为例,介绍了提高SMT生产线效率的方法和经验,包括PCB工艺设计、生产线平衡、优化、管理措施等,希望对相关工程人员有一定帮助。 In order to achieve maximum a key equipment in SMT line, so it is IT line, line efficiency should prove the mounter efficiency of improving the mounters' output from SM important to im example, this paper introduces method and experience be taken into account. Mounter is Using universal mounters as an efficiency, including PCB design, line balance, optimization, management measures, etc. It is expected to be valuable for engineers.
作者 鲜飞
出处 《中国集成电路》 2009年第2期56-60,共5页 China lntegrated Circuit
关键词 优化 贴片机 生产线平衡 负荷分配 Optimization Mounter Line balance Load distribution
  • 相关文献

参考文献4

二级参考文献27

  • 1Ball M O.Magazine Sequencing of insertions in printed circuit board assembly[J].Operations research,1988,36:192-201.
  • 2Laarhoven P V,Zijm M.Production preparation and numerical control in PCB assembly[J].International journal of flexible manufacturing systems,1988,5 (3):187 -207.
  • 3Wang W,Nelson P C,Tirpak T M.Optimization of high -speed multistation SMT placement machines using evolutionary algorithms[J].IEEE transactions on electronics packing manufacturing,1999,22(2):137-146.
  • 4Burke E K,Cowling P,Keuthen R.The printed circuit board assembly problem:heuristic approaches for multi headed placement machinery[C].Proc of the IC AI2001,las vegas,2001.1456-1462.
  • 5Loh T S,Bukkapatnam S T S,Medeiros D et al.A genetic algorithm for sequential part assignment for PCB assembly[J].Computer and ind Eng,2001,40:293-307.
  • 6Kumar R Li H.Integer programming approach to printed circuit board assembly time optimization[J].IEEE transactions on components,packaging and manufacturing technology,1995,18 (4):720-727.
  • 7Ahmadi R H,Mamer J W.Routing heuristics for automated pick and place machines[J].European journal of operational research,1999,117:533-552.
  • 8Fu H P,Su C T.A comparison of search techniques for minimizing assembly time in printed wiring assembly[J].J of production economics,2000,63:83-98.
  • 9Hop N V,Tabucanon M T.Extended dynamic point specification approach to sequencing robot moves for PCB assembly[J].J Prod Research,2001,39 (8):1671 -1687.
  • 10Su Y S,Wang C,Egbelu P J et al.Dynamic points specification approach to sequencing robot moves for pcb assembly[J].J computer integrated manufacturing,1995,8(6):448 -456.

共引文献49

同被引文献7

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部