摘要
根据现场条件及以往施工经验对龙厦铁路象山隧道4#斜井的设计方案进行了优化,从技术、安全、施工速度、施工通风、经济效益等几个方面进行了比较,优化后的方案可以达到确保工期、节约成本的目的,对于以后的类似工程有一定的参考价值。
The design scheme of No. 4 inclined shaft of Xiangshan Tunnel on Longyan-Xiamen Railway is optimized according to the actual conditions and construction experiences. The optimized design scheme is compared with the original scheme in terms of technology, safety, construction speed, construction ventilation and economic benefits. The optimized scheme can guarantee the completion of the project on time and can reduce the cost. The paper can provide reference for similar projects in the future.
出处
《隧道建设》
2009年第1期97-100,共4页
Tunnel Construction
关键词
长大隧道
斜井
施工方案
比选
long tunnel
inclined shaft
construction scheme
selection