期刊文献+

基于动态规划的铁水运输智能调度方法 被引量:4

Intelligent Scheduling Method of Molten Iron's Transportation Based on the Dynamic Program
下载PDF
导出
摘要 以钢铁企业的铁水运输为背景,以机车和鱼雷混铁车(Torpedo Car,简称TPC)为运输工具,依托厂区铁路网络,建立了路段预约机制和碰撞检测模型,提出了近邻分配、进程调度和分组优化的铁水优化调度方法,并根据铁水需求和运输距离等因素,采用动态规划确定车辆的最佳数量。在开发的两层C/S分布式铁水智能调度仿真系统上,应用现场采集的原始数据进行仿真,结果表明智能调度方法具有先进性和实用性的特点。 This article with the background of the molten iron's transportation established the reserving mechanism and the collision detection model concerning on using locomotives and Torpedo Cars(TPC) depending on the factory's railway net.It carried out the molten iron's optimal scheduling method such as nearby distributing,the tenor scheduling and the grouping optimizing method using the dynamic program to confirm the optimal numbers based on the factors like the requirement of the molten iron,the transported distance and so on.It used the initialized data collected on the scene based on the two tiers C/S molten iron's distributing intelligent scheduling simulation system,which indicated the intelligent scheduling method is advanced and practical.
作者 赵海霞 刘梅
出处 《青岛科技大学学报(自然科学版)》 CAS 2009年第1期70-73,共4页 Journal of Qingdao University of Science and Technology:Natural Science Edition
关键词 动态规划 铁水运输 智能调度 避碰算法 dynamic program molten iron's transportation intelligent scheduling collision avoid algorithm
  • 相关文献

参考文献11

  • 1刘峰.宝钢铁水运输组织及运输能力分析[J].宝钢技术,2001(5):1-5. 被引量:13
  • 2徐冬,费炳铨.钢厂铁水运输系统的计算机控制研究[J].上海大学学报(自然科学版),1999,5(2):144-148. 被引量:3
  • 3Lee H S, Murthy S S, Haider S W, et al. Primary production scheduling at steelmaking industries [J]. IBM J Res&Develop, 1996, 40(2) :231-252.
  • 4Jayamohan M S, Rajendran C. New dispatchingrules for shop scheduling: a step forward[J]. International Journal of Production Research, 2000, 38(3):563-586.
  • 5Honkomp S J, Reklaitis G V. Robust scheduling with processing time uncertainty [J]. Computers and Chemical Engineering, 1997,21(S1) : 1055-1060.
  • 6Haghan I A, Banihashem I M. Heuristic approaches for solving large scale bus transit vehicle scheduling problem with route time constraints [J]. Transportation Research, 2002, 36(4) :309-333.
  • 7Baita F, Pesenti R, Ukovich W. A comparison of different solution approaches to the vehicle scheduling problem in a practical case [J]. Computers & Operations Research,2000, 27(13) : 1249-1269.
  • 8Chen H, Yao D D. Dynamic scheduling control of a multiclass fluid network[J]. Operations Research, 1995,41 (1) : 104-115.
  • 9于达,张钹,陈陈.调度问题的HPN模型研究[J].计算机研究与发展,1996,33(5):321-328. 被引量:13
  • 10Musser K L, Dhingra J S, Blankenship G L. Optimization Based Job Shop Scheduling[J]. IEEE Transactions on automatic control, 1993, 38(5):808-813.

二级参考文献9

共引文献35

同被引文献30

引证文献4

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部