某框架楼托梁拔柱改造设计与施工 被引量:6

Supporting beam and removing column reform design and construction of a frame structure building
原文传递
导出
摘要 该工程新的使用功能需将原结构居中的1根框架柱拔掉。设计中采用混凝土框架梁、柱增大截面法,同时框架梁双向跨度变大且形成十字梁。施工中遵循"先加固、后拔柱"的原则,首先对基础注浆加固,对梁、柱分别采用水泥基灌浆料、混凝土增大截面,再行拔柱。 The construction of new features needs to remove one frame column.The consolidation beam and column design is given by using cross-section increment in the engineer,and extends for the frame beam of the original structure to form cross-beam.Abide by first strengthening then removing the concrete column in construction,first the foundation is reinforced by pressure grouting technology,beams and columns were used cement-based grouting material and concrete to increase cross-section,then remove the frame column.
出处 《建筑结构》 CSCD 北大核心 2010年第S2期288-290,共3页 Building Structure
关键词 托梁拔柱 加固 supporting beam removing column strengthening
  • 相关文献

参考文献1

  • 1GB 50367-2006.混凝土结构加固设计规范[S],2006.

同被引文献62

引证文献6

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部