2[1]Carrio L,Streett F,Mahoney K,et al.Practical considerallon for design of a step-feed biological nutnent removal system[A].Proceedings of 73rd Annual Conference and Exposition[C].USA:Anaheim,California,2000.
3[2]Crawford G,Black S,Stafford D,et al.The step bio-P process at lethbridge-over one full year of operation[A].Proceedings of 73rd Annual Conference and Exposition[C].USA:Anaheim,California,2000.
4[3]Sakai Y,Koike S.Development of step-feed multi stage denitrification-nitrification process[A].Proceedings of Water Environment Federation 71st Annual Conference and Exposition[C].USA:Orlando,FL,1998.
5[4]Milind V Wable,Carlo Spani.Side by side comparison of step feed and plug flow activated sludge process perfor-mance at the rock creek advanced wastewater treatment facility[A].Proceedings of 75th Annual Technical Exhibition and Conference[C].Illinois USA:McCormick Place,Chicago,2002.
6[5]Fillos J,Ramalingam K,CalTio L A.Full-scale evaluat-lon of step-feed BNR process at a New York City water pollution control plant[A].Proceedings of 75th Annual Technical Exhibition and Conference[C].Illinois USA:McCormick Place,Chicago,2002.
7Kos P. Short SRT (Solids Retention Time)nitrification process/flowsheet. Wat Sci Tech, 1998,38(1): 1~2
8Chudoba P, Pujol R. Technical solutions for upgrading high rate and medium loaded activated sludge plants for nutrient removal. Wat Sci Tech,2000,41 (9): 131~ 138
9Randall W, Sen D Full-scale evaluation of an integrated fixed-film activated sludge( IFAS)process for enhanced nitrogen removal. Wat Sci Tech, 1996,33 (12): 155~ 162
10Müller N. Implementing biofilm carriers into activated sludge process- 15 years of experience. Wat Sci Tech, 1998, 37 ( 9 ):167~ 174