期刊文献+

Practicality of power load management system in Chongqing City verified

Practicality of power load management system in Chongqing City verified
下载PDF
导出
摘要 Began from early 1992, Chongqing Power Supply Bureau had spent 3 and half years to build up a power load management system consisting of I master station, 6 relay stations, 1280 terminals and the distributed monitoring device. This system distributes in the hilly and mountainous areas where geographically complicated and the load widely scatters, it can supervise about 72% load and curtail more than 15% load
出处 《Electricity》 1996年第3期45-45,共1页 电气(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部