摘要
钻孔夯扩挤密复合桩地基和预制钢筋混凝土桩基方案及振动沉管、长螺旋压灌素混凝土桩复合地基方案进行了经济、技术、施工。
The schemes of down drilled hole dynamic compaction composite column-soil foundation, prefabricated reinforced concrete pile foundation and long auger rig vibrating driven cast - in place non-reinforced concrete pile composite foundation are comparatively analysed according to economy, technique, construction and project time limit.
出处
《岩土工程技术》
1998年第2期20-23,共4页
Geotechnical Engineering Technique
关键词
钻孔夯扩挤密
复合桩地基
复合地基
桩基础
down drilled hole dynamic compaction composite column-soil foundation composite foundation pile foundation