摘要
介绍了小榄特大桥基础承台钢板桩围堰的设计及施工技术,对钢板桩围堰施工进行了监测,提出了承台施工的控制措施,通过小榄特大桥工程说明了采用钢板桩围堰不仅缩短了工期,而且保证了工程质量。
This article introduces Siu Larn Bridge units for basic steel sheet pile cofferdam design and construction technology, and supervises steel sheet pile cofferdam construction and proposes controlling measures for construction of cushion cap. The Siu Lain Bridge project represents that adoption of steel sheet pile cofferdam shorten the constructional term and ensure the project's quality.