期刊文献+

供应链提前期及其相关成本研究 被引量:1

Research on The Lead Time of Supply Chain And Its Related Cost
下载PDF
导出
摘要 通过建立面向制造商——供应商所构成的二级供应链系统提前期压缩与相关成本模型,分析得出该二级供应链总成本是提前期的凸函数以及总成本将在每个区间端点处获得的结论。具体算例表明:对提前期进行压缩后,制造商成本将下降,而供应商成本将上升,且成本下降幅度要大于成本上升幅度;需要通过转移支付手段对成本上升方给予适当的补偿。 On the basis of comprehensive analyzing supply chain lead-time and the research of the relevant cost, with setting related assumptions, the mode of lead-time reduction and related costs that faces the secondary supply chain composed of manufactures and suppliers was established. Finally, drawing to the conclusion that the total cost in the secondary supply-chain is the convex function of the lead time, besides, the total cost will be obtained at each interval end point. Through the concrete cases, after clashing the lead-time, the manufacturer' s cost will decrease, while the supplier' s cost will increase, what is more, the range of decreasing cost is greater than that of the increasing cost. Therefore, transferred payment is needed to properly compensate the supplier.
出处 《组合机床与自动化加工技术》 北大核心 2009年第4期96-100,共5页 Modular Machine Tool & Automatic Manufacturing Technique
基金 国家自然科学基金项目(70771073)
关键词 提前期压缩 供应链协调 制造商成本 供应商成本 lead-time reduction supply chain coordination manufacturer's cost supplier' s cost
  • 相关文献

参考文献10

  • 1Si WOOK RYU, KYUNG KEUN LEE. A stochastic inventory model of dual sourced supply chain with lead-time reduction [ J ]. International Journal of Production Economics, 2003,81 (11) :513 -524.
  • 2LEONORA BOTTANI, ANTONIO RIZZI. An adapted multi-criteria approach to suppliers and products selection-An application oriented to lead-time reduction[ J ]. International Journal of Production Economics ,2008,111 ( 1 - 2 ) :763 - 781.
  • 3SUZANNE DE TREVILLEROY D SHAPIRO, ARI-PEKKA HAMERI. From supply chain to demand chain:the role of lead time reduction in improving demand chain performance [J]. Journal of Operations Management, 2004,21 ( 10 ) : 613 - 627.
  • 4LIANG-YUH OUYANG, CHENG-KANG CHEN, Hung-Chi Chang. Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process [J].Computers & Operations Research, 2002,29 (12) :1701 - 1717.
  • 5MASSIMO BERTOLINI, ELEONORA BOTTANI, ANTONIO RIZZI. Lead time reduction through ICT application in the footwear industry: A case study [ J ]. International Journal of Production Economics ,2007,1 ( 10 ) : 198 - 212.
  • 6梅晚霞,马士华.(Q,r)库存中的提前期压缩问题研究[J].中国管理科学,2007,15(6):73-77. 被引量:5
  • 7李明,戴更新,韩广华,张冲.二级供应链中提前期压缩的价格协调机制[J].运筹与管理,2008,17(2):87-92. 被引量:5
  • 8谢家平,陈荣秋.基于时间竞争的绿色再制造运作管理模式研究[J].中国流通经济,2003,17(8):61-64. 被引量:15
  • 9LIANG-YUH OUYANG, KUN-SHAN WU, CHIA-HUEI HO. An integrated vendor-buyer inventory model with quality improvement and lead time reduction [ J ]. Int. J. Production Economics, 2007,10 ( 8 ) : 349 - 358.
  • 10雷小清.论供应链中的时间压缩[J].商讯(商业经济文荟),2004(2):84-87. 被引量:4

二级参考文献37

  • 1鲁其辉,朱道立,林正华.带有快速反应策略供应链系统的补偿策略研究[J].管理科学学报,2004,7(4):14-23. 被引量:30
  • 2宋华明,马士华.供应链中提前期压缩的Pareto优化[J].控制与决策,2006,21(7):776-780. 被引量:11
  • 3中国工程院.绿色再制造工程及其在我国应用的前景咨询报告[R].,..
  • 4[17]Choi,J.W..Investment in the reduction of uncertainties in just-in-time purchasing systems[J].Naval Research Logistics,1994,41:257-272.
  • 5[18]James H.Bookbinder,Metin Cakanyildirim.Random lead time and expedited orders in inventory systems[J].European Journal of Operational Research,1999,115:300-313.
  • 6[19]Wolff R.G..Stochastic Modeling and the Theory of Queues[M].Prentice Hall,Englewood Cliffs,NJ.1989.
  • 7[20]Zheng,Y-S.On properties of stochastic inventory systems[J].Management science,1992,38(1):87-103.
  • 8[1]Stalk,G.Jr.and Hout,T.M..Competing against time:how time-based competition is reshaping global markets[M].The free press,New York,1990.
  • 9[2]Blackburn,J.D.Time-based competition:the next battleground in American manufacturing[M].Irwin,Homewood,Il,1991.
  • 10[3]Marr,N.E..Do managers really know what service their customersrequire?[J].Journal of physical distribution and logistics management,1994,24 (4):24-31.

共引文献24

同被引文献9

  • 1沈毅强,江孝感.产品全生命周期价值计量与决策[J].现代管理科学,2006(7):87-88. 被引量:1
  • 2R.J. Tersine. Principles of Inventory and Materials Management[M]. New Jersey:Prentice Hall, Englewood Cliffs, New Jersey: 1994.
  • 3A .Matthew, W. Dennis, S. Robert. Reengineering Order Fulfillment [J]. The International Journal of logistics Managemnet, 1995,6(2).
  • 4B.B.Yi, G.Joseph. Invertory and Lead Time Planning with Lead-time-sensitive Demand[J].IIE Transactions,2007,(39).
  • 5J. H. Wallace, L. S. Mark, L. W. David. Strategies for Lead Time Re- duction[J]. Manufacturing Review, 1990,3(2).
  • 6C.J.Liao,C.H. Shyu. An Analytical Determination of Lead Time with Normal Demand[J]. International Journal of Operations & Production Management, 1991,11(9).
  • 7M. Ben-Daya, A. Raouf. Inventory Models Involving Lead Time as De- cision Variable[J]. Journal of Operational Research Society, 1994,45(5).
  • 8许一敏,马士华.面向订单履行的提前期构成因素与策略[J].上海管理科学,2007,29(5):32-34. 被引量:2
  • 9陈华,苏春生,周支立.提前期敏感商品的销售商采购提前期压缩[J].系统工程,2009,27(9):41-48. 被引量:3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部