摘要
介绍了国道主干线(GZ40)二河公路云南蒙自-新街高速公路黑冲沟连续刚构桥(98m+180m+98m)施工监控、监测的过程,观测数据和分析方法对同类连续刚构桥的施工监控提供了参考。
The construction monitoring process in a continuous rigid frame bridge named Heichonggou (98 m+180 m+98 m) on the Meng-Xin Expressway of the national trunk highway (GZ40) is intronduced. A great deal of data and measures are presented to supply the reference for same type bridge.
出处
《公路》
北大核心
2009年第4期32-36,共5页
Highway
关键词
连续刚构桥
施工监控
continuous rigid frame bridge
construction monitoring