某金铜矿为了给合理确定新建7000t/d选矿厂的工艺流程方案提供依据,通过试验对原有900t/d选矿厂的工艺流程进行了优化研究。结果表明:原流程中所采用的洗矿作业可以取消;原流程所采用的阶段磨浮工艺可简化为一段磨浮工艺;可利用复合捕收剂来提高浮选回收率;浮选尾矿的再处理方案应由原来的单一重选改为重选—再磨—浮选或重选—再磨—氰化浸出。
To determine the rational process flowsheet plan for its new 7 000 t/d concentrator, a gold-copper mine conducted a research to optimize its original 900 t/d eoncentrator's process flowsheet. The result shows that it is better to eliminate the original ore-washing operation; to simplify the original multi-stage grinding-flotation process into one stage grinding-flotation ; to use a composite collector to improve the flotation recovery ; and to replace the single gravity separation for the retreatment of flotation railings by gravity separation-regrinding-flotation process or by gravity separation-regrindingcyanide leaching process.
出处
《金属矿山》
CAS
北大核心
2009年第4期56-59,共4页
Metal Mine
关键词
金铜矿
选矿工艺优化
磨浮工艺
复合捕收剂
浮选尾矿再处理
Gold-copper ore, Optimization of beneficiation process, Grinding-flotation process, Composite collector,Retreatment of flotation tailings