计及可靠性的电力市场分时定价方法 被引量:7

Power System Hourly Pricing Methods Considering Reliability
下载PDF
导出
摘要 发电上网分时电价与当时的发电燃料边际成本及供电风险密切相关,随机生产模拟计算可以给出系统的最优发电方式、燃料费用、边际发电成本及系统可靠性指标。在随机生产模拟计算的基础上,提出了3种既考虑电能成本又考虑风险成本(可靠性成本)的分时电价制定方案,并以某实际系统为例计算出典型日运行方式下每种方案的分时电价,同时统计出该运行方式下的峰、腰、谷分时电价比,为电网实现分时电价提供了参考和依据。 Power system hourly price is closely related to power energy marginal cost and risk cost. By stochastic production simulation, the optimal generation scheduler, fuel cost, system marginal cost and reliability indices can be obtained. Based on the stochastic production simulation results, three electricity pricing models and the principle of partition of the peak-valley electricity price are discussed. At last, a practical power system is utilized to obtain the different power system hourly prices and the ratio of peak-waist-valley price, which can provide references for the establishment of the actual power price.
出处 《电力系统自动化》 EI CSCD 北大核心 2009年第10期29-33,共5页 Automation of Electric Power Systems
基金 国家重点基础研究发展计划(973计划)资助项目(2004CB217905) 国家自然科学基金资助项目(50777052)~~
关键词 分时电价 边际生产成本 可靠性 随机生产模拟 hourly price marginal production cost reliability stochastic production simulation
  • 相关文献

参考文献8

二级参考文献31

  • 1王锡凡.包含多个水电机组的随机生产模拟[J].西安交通大学学报,1985,(4).
  • 2王锡凡.电力系统优化规划[M].北京:水利电力出版社,1991..
  • 3言茂松.电能价值多重分析和分时电价预测[M].北京:中国电力出版社,1998..
  • 4夏清,中国电机工程学报,1994年,14卷,3期
  • 5王少军,硕士学位论文,1992年
  • 6王锡凡,西安交通大学学报,1985年,19卷,4期
  • 7Juan J,IEEE Trans Power Systems,1997年,12卷,4期,1561页
  • 8Wang Xifan,Modern Power System Planning,1994年
  • 9王锡凡,电力系统优化规划,1990年
  • 10王锡凡,中国电力,1999年,32卷,2期

共引文献241

同被引文献125

引证文献7

二级引证文献87

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部