2Jean Yves Blais.The HASTUS Vehicle and Manpower Scheduling System at the S.T.C.U.M[J].Interface,1990,20(1):258-265.
3Ball M.A Matching Based Heuristic for Scheduling Mass Transit Crew and Vehicles[J].Transportation Sci,1983,17(1):1427-1435.
4Ketan Kotecha,Gopi Sanghani,Nilesh Gambhava.Genetic Algorithm for Airline Crew Scheduling Problem Using Cost-Based Uniform Crossover[J].Lecture Notes in Computer Science,2004,3285(2):84-96.
5Peter Brucker,Sigrid Knust.Resource-constrained Project Scheduling and Timetabling[J].Lecture Notes in Computer Science,2001,2079(1):277-283.
6Boschetti M A,Mingozzi A,Ricciardelli S.An Exact Algorithm for the Simplified Multiple Depot Crew Scheduling Problem[J].Annals of Operations Research,1998,1271(4):177-201.
7Beasley J E,Cao B.Dynamic programming based algorithm of crew scheduling[J].Computers and Operations Research,1998,25(1):567-582.
8Jean Y B.The HASTUS vehicle and manpower scheduling system at the S.T.C.U.M[J].Interface,1990,20(1):258.
9Ball M.A matching based heuristic for scheduling mass transit crew and vehicles[J].Transportation Sci,1983,17(1):1427.
10Kotecha K,Sanghani G,Gambhava N.Genetic algorithm for airline crew scheduling problem using cost-based uniform crossover[J].Lecture Notes in Computer Science,2004,3285(2):84.