广东电网500kV主环网安全稳定控制方案 被引量:1

Security and Stability Control Scheme for 500kV Main Ring Network of Guangdong Power Grid
下载PDF
导出
摘要 为保障"西电东送"政策的安全实施,制定了2008年度广东电网500kV主环网安全稳定控制方案。按照协调优化的原则,安全稳定控制方案除常规的切机组、切负荷外,还采取了快速切除元件、改变运行方式等新措施,兼顾了与南方电网安全稳定控制方案的协调,综合考虑了"N-2"故障下稳定控制措施与"N-1"控制原则、检修方式下运行方式的调整以及就地控制功能的协调。 To secure the safe implementation of "West-to-East Electricity Transmission" policy, the security and stability control scheme of 2008 is established for 500 kV main ring network of Guangdong grid. Following the coordination and optimization rule, the scheme takes into consideration various control measures, which include unit tripping, load shedding, power equipment rapid tripping and operational mode adjustment. In the scheme, the control measures under N-2 contingencies are scheduled in coordination with the control strategy of N-1 contingency, the operational mode adjustment under maintenance mode as well as the local control functionality.
出处 《广东电力》 2009年第5期7-11,共5页 Guangdong Electric Power
关键词 广东电网 安全稳定控制 运行方式 500 kV主环网 Guangdong power network security and stability control operational mode 500 kV main ring network
  • 相关文献

参考文献8

二级参考文献8

共引文献69

同被引文献9

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部