白山水电站的扩建项目,其输水系统的布置经方案比较,采用引水洞两机两洞,地下式厂房;尾水洞为两机一洞布置,两个进水口布置在二期厂房与白山水库泄洪洞冲坑之间的左崖山体处;出水口布置在大坝左肩上游约120 m处。其设计经论证比较在技术上是可行的,经济上是合理的。
Based on the scheme comparison,the layout of water conveyance system is determined in the extension project of Baishan pumped storage power station.In this layout,the diversion tunnel adopts the twomachine,the two-tunnel and underground power house,and the tailrace tunnel adopts the two-machine and one-tunnel.The two intakes are layout at the left of mountain body between the second stage powerhouse and spillway tunnel scour pool of Baishan reservoir,and the outlet is layout at the upper reaches about 120m of the left shoulder of dam.The design is feasible in economy and technology by demonstration and comparison.
出处
《东北水利水电》
2009年第6期1-3,共3页
Water Resources & Hydropower of Northeast China
关键词
输水系统
布置
白山抽水蓄能电站
water conveyance system
layout
Baishan pumped storage power station