菏泽发电厂300MW机组定滑压运行经济性试验分析 被引量:4

The Efficient Comparative Assay about the Constant or Variable Pressure Operation of 300MW Unit of Heze Power Plant
下载PDF
导出
摘要 对菏泽发电厂运行的300MW机组分别在不同的工况下,采用不同的运行方式进行试验研究,对其所产生的经济性进行了比较分析,研究并提出了相应的措施,为同类机组的经济运行提供参考依据。 AbstThe article comparatively analysises the economical efficiency of the 300MW units of Heze Power Plant, after study the experiment of the units by different working plans under different work conditions. And the corresponding measure was also proposed, which provided the reference for the similar unit's economical movement.
出处 《汽轮机技术》 北大核心 2009年第3期220-222,共3页 Turbine Technology
关键词 300MW汽轮机 滑压运行 定压运行 steam turbine 300MW variable-pressure operation constant- pressure operation
  • 相关文献

参考文献4

  • 1田金玉.热力发电厂[M].北京:水利电力出版社,1986..
  • 2郑体宽.热力发电厂[M].北京:中国电力出版社,2004.
  • 3章德龙.单元机组集控运行[M].北京:中国电力出版社,1998.
  • 4沈士一.汽轮机原理[M].北京:中国电力出版社,2005.

共引文献5

同被引文献38

  • 1刘国跃,朱宝田,雷兆团.超临界及超超临界机组的运行特性研究[J].电力设备,2006,7(4):7-10. 被引量:13
  • 2邱林.变负荷运行对热泵性能系数影响的分析[J].节能技术,2006,24(5):419-420. 被引量:4
  • 3Vitalis B P, Hunt P J. Constant and sliding pressure options for new supercritical plants [A]. Presented at Power-Gen International 2005 [C]. Las Vegas, 2005.
  • 4河南省电力公司.火电工程调试技术手册-锅炉卷[M].北京:中国电力出版社,2002.
  • 5Jantti T, Sundqvist K, Psik R, et al. Lagisza 460 MWe supercritical CFB -design, start-up and initial operation experience [A]. Presented at PowerGen Europe Cologne [C]. Germany, 2009.
  • 6Hotta A. Features and Operational performance of Lagisza 460 MWe CFB boiler [A]. Presented at The 20th International Conference on Fluidized Bed Combustion [C]. Xi'an: China, 2009.
  • 7Utt J, Hotta A, Stephen Goidich. Utility CFB goes "supercritical" -Foster Wheeler's Lagisza 460 MWe operating experience and 600-800 MWe designs [A]. Presented at Coal-Gen 2009 [C]. Charlotte, 2009.
  • 8Hotta A. Features and operational performance of Lagisza 460 MWe CFB boiler [A]. Presented at The 20th International Conference on Fluidized Bed Combustion [C]. Xi'an: China, 2009.
  • 9Fan Z, Goidich S, Robertson A, et al. Performance and economics of ultra supercritical pressure CFB boiler power plants [A]. The 32nd lntemational Technical Conference on Coal Utilization & Fuel Systems [C]. Clearwater, 2007.
  • 10冯洋,王慧,邱文奇.循环流化床锅炉升降负荷的运行调节[J].工业锅炉,2007(4):43-45. 被引量:1

引证文献4

二级引证文献53

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部