摘要
阐述了目标同为降低海上作业时间的3种风机安装理念,探讨了风机基础的选用与安装,并对比介绍了各种风机安装船舶。最后对我国海上风电场的风机安装提出了几点建议。
This paper introduces three wind turbine installation concepts with the same target to reduce the offshore operation time, as well as the selection and installation of turbine foundation. Compared various turbine installation vessels,the paper puts forward a few suggestions to the turbine installation in Chinese offshore wind farms.
出处
《中国海洋平台》
2009年第3期35-41,共7页
China offshore Platform
关键词
海上风机
风机基础
安装方法
安装船舶
offshore wind turbine
turbine foundation
installation method
installation vessel