摘要
对我国某水电站,在厂房与坝体联合作用下,用三维有限元法对厂房结构进行了运行期最大温升及最大温降二种极端情况下的位移及温度应力分析,为工程设计提供了可靠的依据。
The three dimentional finite element method is used to carry out the displacement and temperature stress analysis of two kinds of extreme cases of maximum temperature rising and falling in the powerhouse structure under the combined action of powerhouse and dam in some hydropower station of our country, thereby providing a reliable basis for engineering design.
出处
《西安理工大学学报》
CAS
1998年第2期206-211,共6页
Journal of Xi'an University of Technology