摘要 文章结合铁寨子1#隧道工程实例,介绍了进洞方案的比选、施工过程中出现的问题及其处理方法,提出了在浅埋偏压、复杂地质条件下采用明拱暗墙法进洞施工技术,既可确保洞口边仰坡稳定,又可保证进洞安全。在施工过程中采用超前长管棚注浆预加固、钢拱架和喷混凝土作初期支护、分部开挖等技术措施,从而确保了隧道施工的安全。 The article presents the practice of Tiezhaizi No. 1 Tunnel,introduces the selection of the options to excavate into the tunnel, questions encountered in the course of construction and methods for tackling them. Open-cut arch and underpinning wall technology was adopted under the condition of shallow cover and uneven pressure and complicated geological conditions to ensure entrance safety and the stability of side slopes at the portal. In the project, advance consolidation by long pipe-roofing and grouting was performed, steel arches and shotcrete were used for primary support, excavation by parts was conducted, and thereupon the construction safety was ensured.
出处 《现代隧道技术》 EI 北大核心 2009年第3期89-92,共4页 Modern Tunnelling Technology
关键词 浅埋偏压 隧道进洞 施工技术 Shallow cover and uneven pressure Excavation into a tunnel Construction technology
  • 相关文献

参考文献10

二级参考文献16

  • 1刘旭全,王永玺,雷向锋,石新桥,李本.监控量测技术在客运专线大断面黄土隧道中的应用[J].铁道标准设计,2007,27(z1):113-117. 被引量:9
  • 2胡庆安,夏永旭,王文正.双连拱隧道施工过程的三维数值模拟[J].长安大学学报(自然科学版),2005,25(1):48-50. 被引量:62
  • 3中华人民共和国行业标准.JTJ026-90公路隧道设计规范[S].北京:人民交通出版社,1990
  • 4郑西客运专线黄土隧道合理支护参数科研报告中间成果[R].成都:中铁二院工程集团有限公司,2007
  • 5梁文灏等.郑西客运专线大断面黄土隧道设计与施工技术要点[C].2006年中国高速铁路隧道国际技术交流会论文集,2006,147-161
  • 6王毅才.隧道工程[M].北京:人民交通出版社,2000.126-147.
  • 7中华人民共和国行业标准.JTJ042-94公路隧道施工技术规范[s].北京:人民交通出版社,1994
  • 8GB 50157—2003 地铁设计规范[S].北京:中国计划出版社,2003.
  • 9GB 50299—1999 地下铁道工程施工及验收规范[S].北京:中国计划出版社,2003.
  • 10北京城建集团.城市快速轨道交通工程施工工艺标准[M].北京:中国计划出版社,2004.