摘要
北京至珠海高速公路广珠段90%位于高含水量深厚软基上,为迎接香港回归,要求在97年7月1日前通车,该段要加快工程进度,半年内施工完毕,本文描述了施工中严格监测内容。
Almost 90% of Guang-zhu section of Beijing-Zhuhai superhighway is located in adistrict of deep soft subgrade. For the welcome of the return of Hongkong,the embankment con-struction work of this section should be completed in half year before July 1, l997. The strictmonitoring works are described in this paper.
出处
《土工基础》
1998年第2期10-14,共5页
Soil Engineering and Foundation
关键词
高速公路
软土地基
施工监测
路堤
Superhighway, Soft sugrade, construction monitoring