期刊文献+

^7Be示踪坡耕地次降雨细沟与细沟间侵蚀 被引量:10

Interrill and rill erosion tracing on cultivated slopes using ^7Be during individual rainfall event
下载PDF
导出
摘要 对于坡面细沟与细沟间侵蚀过程的了解是建立侵蚀预报模型的基础,但传统方法难以对其进行深入研究。利用7Be示踪技术并结合人工模拟降雨,考虑坡脚沉积作用,研究了25°坡耕地径流小区次降雨过程中细沟与细沟间侵蚀动态。结果表明:根据流出径流小区泥沙7Be含量变化计算坡面明显细沟出现时间,由于坡脚沉积作用使得A、B两试验小区这一时间比实际细沟出现分别延迟了45min和11min;根据坡面-侵蚀泥沙中7Be总量守恒和泥沙质量平衡原理,坡面细沟间侵蚀及细沟侵蚀在坡面总侵蚀、坡脚沉积区泥沙及流出径流小区泥沙中的比例被定量区分开;总体上,细沟间侵蚀量在径流泥沙中的比例逐渐减少,而细沟侵蚀量逐渐增加。两试验小区中7Be示踪计算坡面细沟侵蚀量和坡脚沉积量与实测值相比相对误差均较小,因此7Be示踪技术可以对土壤侵蚀进行较为准确地定量研究。 Understanding the processes of interrill and fill erosion is necessary to develop soil erosion prediction models. However, it is difficult to obtain the information using traditional monitoring techniques. In the study, considering deposition at the base of slope area, ^7Be was used as a tracer to describe the interrill and rill erosion dynamic during a simulated rainfall event in a slope farmland with a gradient of 25°. The results indicated that the appearance time of significant rill calculated by ^7Be content of sediment exuded from the A and B plots was delayed for 45 min and 11 min respectively compared with actual time because of deposition at the base of slope area. Based on the mass balance of ^7Be in the eroded soil and in the sediment and the balance of sediment mass, contributions of interrill and rill erosion were separately partitioned to the total soil loss, deposition at the base of slope area and sediment from the plots. In total, the contributions of interrill erosion to the sediment which was delivered out of plot gradually decreased temporally and rill erosion increased. In both plots, the relative errors between calculation values of rill erosion on slopes and deposition in the foot area using^ 7Be and measurement values of them were low. Therefore,^ 7Be tracer could accurately quantify the processes of soil erosion .
出处 《农业工程学报》 EI CAS CSCD 北大核心 2009年第5期47-53,共7页 Transactions of the Chinese Society of Agricultural Engineering
基金 国家重点基础研究发展计划“973”资助项目(2007CB407201) 国家自然科学基金资助项目(40401032) 教育部“新世纪优秀人才支持计划”项目
关键词 细沟间侵蚀 细沟侵蚀 沉积 7Be示踪 人工模拟降雨 interrill erosion, rill erosion, deposition,^ 7Be tracer, simulated rainfall
  • 相关文献

参考文献20

二级参考文献92

共引文献345

同被引文献152

引证文献10

二级引证文献64

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部