摘要
GGH是火电厂湿法脱硫装置中除吸收塔外的另一关键设备,以豪顿华的33.5GVN200烟气再热器为例,介绍了转子拼装与焊接施工方法。
In addition to the absorption tower,GGH is another key equipment in wet FGD installs of power plants. Take 33.5 GVN200 GGH of Holden for example, this paper introduces the methods of assembling and welding of rotors.
出处
《山东电力技术》
2009年第4期73-75,共3页
Shandong Electric Power
关键词
湿法脱硫
GGH
转子
安装
焊接
wet desulfurization
GGH
rotator
assemble
weld