随机双目标焊接车间调度建模与仿真 被引量:2

Modeling and Simulation of Stochastic Double-objective Scheduling Problem in Welding Workshop
原文传递
导出
摘要 针对一个生产大型机械产品(如架桥机等)的企业的焊接车间的调度问题进行研究,对m位工人加工n个结构件的随机调度问题建立数学模型,并以最小化最大的加工完成时间的期望与方差为优化目标。为求解该模型,对二进制粒子群算法(BPSO)进行改进,并采用动态领域策略、新的粒子个体极值选择以及一维优化方法求解双目标优化问题。通过实例仿真,结果证实修改后的算法是有效的,并能够找到Pareto前沿解。 The scheduling problem was based on a real welding workshop in a large manufacturing enterprise. A stochastic scheduling problem consisting of m workers and n jobs was dealt with and a mathematic model was developed to minimize maximum expected value and variance of the completion time. In order to solve the problem, Binary Particle Swarm Optimization (BPSO) algorithm was modified, and a dynamic neighborhood strategy, new particle memory updating, and one-dimension optimization method were used to solve two objectives problem. A simulation example was carried out to illustrate that the improved method could efficiently find Pareto front solutions.
出处 《系统仿真学报》 CAS CSCD 北大核心 2009年第13期3906-3909,3913,共5页 Journal of System Simulation
基金 国家自然科学基金(70871005 70671007) 航空科学基金(2007ZG51075)
关键词 调度 双目标 PARETO 二进制粒子群优化(BPSO) scheduling double-objective Pareto Binary Particle Swarm Optimization (BPSO)
  • 相关文献

参考文献11

  • 1PINEDO M. Scheduling: Theory, Algorithms, and Systems [M]. USA: Prentice Hall, 2002.
  • 2LUH PETER B, CHEN D, Thakur Lakshman S. An effective approach for Job-shop scheduling with uncertain processing requirements [J]. IEEE Transactions on Robotics and Automation (S1042-296X), 1999, 15(2): 328-339.
  • 3TAVAKKOLI-MOGHADDAM R, JOI.,AI F, VAZIRI F, etal. A bybrid method for solving stochastic job shop scheduling problems [J]. Applied Mathematics and Computation (S0096-3003), 2005, 170(1): 185-206.
  • 4GINZBURG D G, GONIK A. Optimal job-shop scheduling with random operations and cost objectives [J]. International Journal of Production Economics (S0925-5273), 2002, 76(2): 147-157.
  • 5MASATOSHI S, TETSUYA M. An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedate [J]. Computer & Industrial Engineering (S0360-8352), 1999, 36(2): 325-341.
  • 6贾兆红,陈华平,孙耀晖.混合粒子群算法在柔性工作车间调度中的应用[J].系统仿真学报,2007,19(20):4743-4747. 被引量:17
  • 7樊坤,张人千,夏国平.基于改进BPSO算法求解一类作业车间调度问题[J].系统工程理论与实践,2007,27(11):111-117. 被引量:8
  • 8EBERHART R, KENNEDY J. A New Optimizer Using Particle Swarm Theory [C]// Proceedings of the Sixth International Symposium on Micro Machine and Human Science. Piscataway, NJ, USA: IEEE Service Center, 1995: 39-43.
  • 9KENNEDY J, EBERHART R C. A discrete binary version of the particle swarm algorithm [C]// Proceedings of the World Multiconference on Systemics, Cybernetics and Informatics. Piscataway, NJ, USA: IEEE Service Center, 1997: 4104-4109.
  • 10SHI Y, EBERHART R C. Empirical study of particle swarm optimization [C]// Proceeding of Congress on Evolutionary Computation. Piscataway, N J, USA: IEEE Service Center, 1999: 1945-1949.

二级参考文献30

  • 1李爱国.多粒子群协同优化算法[J].复旦学报(自然科学版),2004,43(5):923-925. 被引量:398
  • 2彭传勇,高亮,邵新宇,周驰.求解作业车间调度问题的广义粒子群优化算法[J].计算机集成制造系统,2006,12(6):911-917. 被引量:30
  • 3陈华平,谷峰,卢冰原,古春生.自适应多目标遗传算法在柔性工作车间调度中的应用[J].系统仿真学报,2006,18(8):2271-2274. 被引量:25
  • 4Ott E,Grebogi C,Yorke J A.Controlling chaos[J].Physical Review Letters (S0031-9007),1990,64(11):1196-1199.
  • 5Franz S Hover,Michael S Triantafyllou.Application of polynomial chaos in stability and control[J].Automatica (S0005-1098),2006,42(5):789-795.
  • 6Yu Wenwu,Cao Jinde.Cryptography based on delayed chaotic neural networks[J].Physics Letters A (S0375-9601),2006,356(4):333-338.
  • 7Liao Gwo-ching,Tsao Ta-peng.Using chaos search immune genetic and fuzzy system for short-term unit commitment algorithm[J].International Journal of Electrical Power and Energy Systems (S0142-0615),2006,28(1):1-12.
  • 8Garey M,Johnson D,Sethi R.The complexity of flow shop and job-shop schedules[J].Mathematics of Operations Research (S0364-765X),1976,1(2):117-129.
  • 9Ho N B,Tay J C.GENACE:an efficient cultural algorithm for solving the flexible job-shop problem[C]// Proceeding of the Congress on Evolutionary Computation CEC2004.Portland,Oregon,USA:IEEE Press,2004:1759-1766.
  • 10Chen H,Ihlow J,Lehmann C.A genetic algorithm for flexible job-shop scheduling[C]// Proceedings of the 1999 IEEE International Conference on Robotics & Automation,Detroit:IEEE,1999:1120-1125.

共引文献23

同被引文献32

引证文献2

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部