屯兰矿12503综采工作面设备安装技术工艺与实践 被引量:2

New Technology and Practice of Equipment Rapid Installation for 12503 Fully Mechanized Coal Face of Tunlan Mining
下载PDF
导出
摘要 对综采设备的安装、运输优点进行了介绍,结合屯兰矿南五盘区12503综采工作面实际情况,重点介绍了综采工作面设备安装的全过程,并对安装时采用的技术工艺、保证措施进行了详细的叙述,采用该方法提高了工作效率,同时也保证了安全生产。 The advantages of the transportation and the installation of fully mechanized mining equipment are introduced. According to the actual situation of the fifth southern district 12503 fully mechanized coal face of the Tunlan Mining, also emphatically introduces the whole process of the equipment installation for the fully mechanized coal faces. The technology of equipment installation and the guarantee measures is described at the same time. With the technology of equipment installation, can improve the work efficiency and ensure the safety of the industrial production.
作者 孙长春
出处 《煤矿机械》 北大核心 2009年第8期169-172,共4页 Coal Mine Machinery
关键词 设备运输 技术工艺 安装实践 equipment transportation technology installation practice
  • 相关文献

参考文献7

共引文献26

同被引文献21

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部