埋地管道外检测方法的组合应用与验证 被引量:10

Use and Verification of Exterual Survey Methods for Buried Pipelines
下载PDF
导出
摘要 介绍了多频管中电流检测法(PCM)和密间隔电位(CIPS)/直流电位梯度(DCVG)组合测试方法的技术特点。认为两种方法的组合应用可以检测和评价埋地管道的阴级保护系统及防腐层的工况。应用组合方法对铁大线局部管段进行了检测。通过分析局部管段防腐层和阴极保护的测试结果,查找到管道涂层存在的破损点,利用皮尔逊法现场开挖验证并定位。检测结果表明,该管段局部防腐层严重减薄,验证了该组合检测方法的有效性。 The paper introduces technological characteristics of integrated PCM and CIPS/DCVG survey for burifed pipelines.It is considered that operation condition of cathodic protection system and coating can be surveyed and evaluated by the integrated survey method.The integrated survey method is utilized in survey of partial pipe sections of Tieling-Dalian()il Pipeline.Defect in pipe coating of the pipe section is detected and located with Person Survey.Survey result displays that the thickness of coating in defect is thinner,which verifies the efficiency of the integrated survey method.
出处 《油气储运》 CAS 北大核心 2009年第8期35-37,共3页 Oil & Gas Storage and Transportation
关键词 埋地管道 外检测 防腐层 阴极保护 检测方法 验证 buried pipeline,external survey,coating,cathodic protection,survey method,verification
  • 相关文献

参考文献7

二级参考文献7

  • 1RICHARD B K. Pipeline integrity and direct assessment. A Layman' s Perspective Pipeline Safety, 2004( 11 ) :2 - 4.
  • 2RP0502-2002 Pipeline external corrosion direct assessment methodology.
  • 3ROBERT G. A closer look at ECDA pre-assessment. March, the NACE International External Corrosion Direct Assessment Conference, Houston ,2003.
  • 4GTI Collaborative Project, Challenging ECDA Situations: Pipeline Integrity Management for Natural Gas Transmission Lines Operated by local Distribution Companies Phase Two, 2003.
  • 5NACE RP0502-2002,管道外腐蚀直接评价方法的推荐做法[S].
  • 6陕京线输气管道防腐层外检测方案[Z].内部资料,2005.
  • 7陕京管道外检测开挖验证现场调查方案[Z].内部资料,2006.

共引文献36

同被引文献96

引证文献10

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部