基于不确定因素视角的关键链缓冲区研究 被引量:15

Research on Critical Chain Buffer Based on the Perspective of Uncertainties
下载PDF
导出
摘要 通过分析影响项目进度的两种类型不确定因素,提出从不确定因素视角认识安全时间,并消减偶然性不确定因素加入的安全时间。在分析项目实施中可能由偶然性不确定因素引发的风险事件基础上,设计了一种确定缓冲区的新方法。该方法考虑了导致安全时间加入的两种因素,在严格控制偶然性风险事件下项目进度能按其期望概率执行。 By analyzing the two types of uncertainties which affect project schedule,the paper proposes to recognize safety time from the perspective of uncertainties,and subtractes the safty time which was triggered by aleatory uncertainties.The paper developes a new approach to setting the buffers based on analyzing the risk events which were triggered by the aleatory uncertainties in the process of project implementation.This approach considers two factors which induce the safety time,then the project schedule can be executed according to its expected probability when aleatory risk events are strictly controlled.
出处 《软科学》 CSSCI 北大核心 2009年第8期26-29,共4页 Soft Science
基金 国家自然科学基金资助项目(70671037)
关键词 关键链 缓冲区 安全时间 不确定因素 风险事件 critical chain buffer safty time uncertainties risk event
  • 相关文献

参考文献8

  • 1艾利·高德拉特.关键链[M].北京:电子工业出版社,2006.
  • 2郝晶莹,白书清.基于关键链的进度计划优化问题研究[J].航天工业管理,2008(4):33-36. 被引量:7
  • 3Kjersti Hoel, Sam G Taylor. Quantifying Buffers for Project Schedule [ J ]. Production and Inventory Management Journal, 1999,40 (2) :43 -47.
  • 4Chiu - Chi Wei, Ping - Hung Liu, Ying - Chin Tsai. Resource Constrainted Project Management Using Enhanced Theory of Constraint[ J]. International of Project Management ,2002,561 - 567.
  • 5蒋国萍,陈英武.中国运筹学会第七届学术交流会论文集[C].香港:Global-Link,2004.719-724.
  • 6刘士新,宋健海,唐加福.资源受限项目调度中缓冲区的设定方法[J].系统工程学报,2006,21(4):381-386. 被引量:70
  • 7Intaver Institute Inc. Project Management Using Event Chain Methodology [ EB/OL ]. http://www. intaver. com/Articles/Article _ EventChainMethodology. pdf.
  • 8何鹏,谭章禄.项目群中风险传播理论研究[J].煤炭经济研究,2006(5):44-46. 被引量:11

二级参考文献18

  • 1Goldratt E M.Critical Chain[M].Great Barrington:The North River Press,1997.
  • 2Hagemann A G.Use of the Critical Chain Project Management Technique at NASA,Langley Research Center[C].AIAA/IEEE Digital Avionics Systems Conference-Proceedings,2001,Oct,14-18:4B11-4B110.
  • 3Rand G K.Critical chain:The theory of constraints applied to project management[J].International Journal of Project Management,2000,18:173-177.
  • 4Steyn H.An investigation into the fundamentals of critical chain project scheduling[J].International Journal of Project Management 2000,19:363-369.
  • 5Herroelen W,Leus R.On the merits and pitfalls of critical chain scheduling[J].Journal of Operations Management,2001,19:559-577.
  • 6Wei C,Liu P,Tsai Y.Resource-constrained project management using enhanced theory of constraint[J].International Journal of Project Management,2002,20:561-567.
  • 7Yeo K T,Ning J H.Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects[J].International Journal of Project Management,2002,20:253 -262.
  • 8Brucker P,Drexl A,Mohring R,et al.Resource-constrained project scheduling:Notation,classification,models,and methods[J].European Journal of Operational Research,1999,112:3-41.
  • 9Tavares L V.A review of the contribution of operational research to project management[J].European Journal of Operational Research,2002,136:1-18.
  • 10Tavares L V,Ferreira J A,Coelho J S.On the optimal management of project risk[J].European Journal of Operational Research,1998,107:451-469.

共引文献90

同被引文献151

引证文献15

二级引证文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部