锅炉安装工程监理预控的主要环节 被引量:1

Key Links in Supervision and Pre-control of Boiler Installation Engineering
下载PDF
导出
摘要 分析了锅炉安装工程监理预控的主要环节,包括:施工组织设计和专项施工方案审核、质量管理体系审查、管理人员及特种作业人员资格的审核、配合施工单位进行组织设计交底和图纸会审、督促施工单位施工技术交底、锅炉及附件进场的验收。探讨了预防质量通病的方法。对实际锅炉安装工程的工程监理预控的工作进行了介绍。 The key links in supervision and pre-control of boiler installation engineering are analyzed, they include auditing the construction organization design and the special construction scheme, examining the quality management system, auditing the qualification of manager and special personnel, cooperating with the construction unit in the organization of meeting on construction drawing explanation and check, urging the construction unit to organize the meeting on construction techniques, checking and accepting the boiler and its accessories on construction site. The method to prevent the common quality fault ring is introduced.
出处 《煤气与热力》 2009年第9期25-27,共3页 Gas & Heat
关键词 锅炉安装工程 监理工作 质量预控 boiler installation engineering supervision work quality pre-control
  • 相关文献

参考文献2

二级参考文献2

共引文献161

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部