3VEPSALAINEN A,MORTON T E.Priority rules for Job Shop scheduling with weighted tardiness costs[J].Management Science,1987,33(8):1036-1047.
4ILKA H,LARS M.Simulation-based assessment of batching strategies in a multi-product semiconductor wafer fabrication facility[C]//Proceedings of the 2003 Winter Simulation Conference.Washington,D.C.,USA:IEEE,2003:1338-1345.
5DEVPURA A,FOWLER J W,CARLYLE MW,et al.Minimizing total weighted tardiness on single batch process machine with incompatible job families[C]//Proceedings of the Symposium on Operations Research 2000.Berlin,Germany:Springer-Verlag,2000:366-371.
6WALLACE J H,MARK L S.Factory physics:foundation of manufacturing management[M].2nd ed.Beijing,China:Tsinghua University Press,2001.
7MATSUMOTO M,NISHIMURA T,MERSENNE T.A 623-dimensionally equidistributed uniform Pseudo-random number generator[J].ACM Transactions on Modeling and Computer Simulation,1998,8(1),3-30.
9PEREZ I,FOWLER J,CARLYLE W M.Minimizing total weighted tardiness on a single batch process machine with incompatible job families[J].Computers and Operations Research,2005,32(2),327-341.
10PINEDO M.Scheduling:theory,algorithms and systems[M].Upper Saddle River,N.J.,USA:Prentice Hall,1995.