小湾水电站建设中的几个技术难题 被引量:9

Technical Difficulties in the Construction of Xiaowan Hydropower Station
下载PDF
导出
摘要 小湾水电站混凝土双曲拱坝是即将建成的世界最高拱坝,许多技术难题位居世界第一,工程建设极具挑战性。结合对关键技术的研究实践与认识,介绍了建设中遇到并成功攻克的700m高工程边坡处理、饮水沟堆积体蠕滑变形治理、坝基岩体开挖卸荷松驰、拱坝混凝土温控防裂等主要技术难题。 The double-curvature concrete arch dam of Xiaowan Hydropower Station is the highest arch dam in the world to be completed soon. The construction of the dam encountered many unprecedented technical difficulties and is thus quite challenging. Combining the research, practices and knowledge of key technologies, this paper introduces main technical problems encountered and successfully conquered during the construction of the Project, such as 700m high slope treatment, creep deformation treatment of Yinshuigou accumulation body, unloaded looseness of rock mass of dam foundation due to excavation, and the temperature control and anti-cracking of concrete of arch dam.
作者 马洪琪
出处 《水力发电》 北大核心 2009年第9期17-21,共5页 Water Power
关键词 创新 技术难题 混凝土双曲拱坝 小湾水电站 innovation technical difficulties double-curvature concrete arch dam Xiaowan Hydropower Station
  • 相关文献

参考文献3

  • 1中国水电工程顾问集团公司.云南澜沧江小湾水电站枢纽工程蓄水安全鉴定报告[R].北京:中国水电工程顾问集团公司,2008.
  • 2中国水电工程顾问集团昆明勘测设计研究院.云南澜沧江小湾水电站拱坝坝基开挖卸荷松驰岩体工程处理措施研究子题中间成果报告[R].云南:中国水电工程顾问集团昆明勘测设计研究院,2008.
  • 3朱伯芳.小温差早冷却缓慢冷却是混凝土坝水管冷却的新方向[J].水利水电技术,2009,40(1):44-50. 被引量:81

二级参考文献2

共引文献80

同被引文献51

引证文献9

二级引证文献149

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部