小湾水电站坝基岩体全过程变形监测成果分析 被引量:4

Analysis of Result on Deformation Monitoring of Xiaowan Arch Dam Foundation Rock Mass
下载PDF
导出
摘要 小湾水电站拱坝坝基岩体地应力高,节理裂隙发育,通过对坝肩开挖前的坝基超前变形、开挖后的卸荷回弹变形和大坝混凝土浇筑后的压缩变形的全过程监测,分析卸荷裂隙分布和张开位移量,定量分析了坝基卸荷岩体变形发展规律,为评价坝基岩体质量和调整坝基岩体力学设计参数以及坝基开挖设计和施工提供了科学依据,对类似工程有参考价值。 The foundation of Xiaowan arc clam has bad geological phenomena such as high ground stress and joint fissures. The whole deformation course monitoring such as advanced deformation before dam abutment excavation, rebound deformation after dam foundation excavation and compression deformation after concrete depositing has been introduced. This paper analyzed unloading crack distribution and opening, deformation rules about unloading rock mass of clam foundation quantification. This paper also provided scientific reference for estimating rock quality, adjusting rock mechanics design parameters of dam foundation and excavation design and execution of Xiaowan dam foundation. This paper was of great reference worth for similar project.
出处 《水力发电》 北大核心 2009年第9期42-45,共4页 Water Power
关键词 坝基岩体 卸荷变形 滑动测微计 多点位移计 小湾水电站 dam foundation rock mass unloading deformation sliding-deformeter multiple position extensometers Xiaowan Hydropower Station
  • 相关文献

参考文献3

  • 1赵华,董泽荣,黄仕俊,等.小湾电站边坡安全监测工程成果分析报告[R].小湾水电站边坡安全监测工程项目部,中国水电顾问集团昆明勘测设计研究院科研分院,2006.1.20
  • 2刘东勇,何瑞良,贺湘军,等.小湾水电工程混凝土双曲拱坝坝基开挖与支护分部工程设计工作报告[R].中国水电顾问集团昆明勘测设计研究院.2005.
  • 3陈光明,刘东勇,薛芝龙,贺湘军,等.小湾水电工程拱坝坝基开挖卸荷松弛影响及工程措施专题报告[R].中国水电顾问集团昆明勘测设计研究院,2006.4

共引文献2

同被引文献17

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部