摘要
介绍了西安供电局330kV北郊变电站直流系统的运行情况,分析了实际运行过程中所出现的问题。对存在问题进行了深入探讨,并提出了改进措施,可对提高变电站直流系统运行可靠性及变电站直流系统的规范化、标准化建设提供参考。
This paper introduces the operation condition of DC system in 330kV Beijiao Substation of Xi'an Power Supply Bureau, and also analyzes several problems occurred during actual operation. Based on the discussion of the problems, the paper presents some improvements to give a reference for improving the operation reliability and the standardization & normalization construction of DC system.
出处
《陕西电力》
2009年第9期68-71,共4页
Shanxi Electric Power
关键词
变电站
直流系统
标准化
substation, DC system, standardization