摘要
亭子口水利枢纽是嘉陵江干流水电开发中的控制性工程,由于建坝蓄水有较大数量的移民搬迁。为了使移民搬迁工作顺利进行,建设单位以人为本,精心组织建设征地实物指标调查,科学制定操作性较强的移民安置规划方案,加强移民安置管理和移民培训工作,取得了较好的经验,可供同业人员参考。
With the characteristics of Tingzikou Project as a key control project in Jialing River, a large amount of people will be relocated as the construction of Project. In order to promote the relocation smoothly, the construction units take peopleoriented as principle, implement well-organized physical indicators survey, develop scientific and operational resettlement plan, strengthen the management and training of resettlement, and achieve good experience for reference by the same project.
出处
《水力发电》
北大核心
2009年第10期11-15,共5页
Water Power
关键词
实物指标调查
移民安置
移民安置规划
移民管理
亭子口水利枢纽
physical indicators survey
resettlement
resettlement planning
migration management
Tingzikou Water Control Proproject