摘要
研究了南水北调(西线)的可调水量,通过调水前后的对比计算,分析了其对长江三峡电站发电指标的影响,并得出了有益的结论.
The objective of this paper is to calculate and analyze the Three Gorges plant electric indices affected by Project of West Route “South to North Water Transfer”,and a useful conclusion is reached.
出处
《水电能源科学》
1998年第3期16-20,共5页
Water Resources and Power
关键词
南水北调
可调水量
水电站
发电效益
水能资源
south to north water transfer
transferring water volume
discrete differential dynamic programming