摘要
针对组合梁在施工中的技术特点与要求,提出在其施工前的主动控制方法、措施和注意事项以及施工前对影响工程质量的4M1E因素的主动控制要点,从而推广这种新型结构在工程建设中的应用。
In view of technical characteristic and requirement for steel-concrete composite beams,active control essential of methods,measurement,matters need attention and active control essential of 4M1E factors which influence building s quality before construction were proposed,popularized the new kind of structure application in engineering.
出处
《山西建筑》
2009年第34期238-239,共2页
Shanxi Architecture
关键词
钢—混凝土组合梁
施工质量
主动控制
steel-concrete composite beams
construction quality
active control