随着煤矿生产建设阶段的变化,仅有的井田勘探报告已不能满足生产需要,将会影响矿井的设计、生产。现阶段对储量块段的划分和储量类别及勘探程度的要求更高,通过对孟津煤矿实际地质条件和井、巷检孔资料的总结分析,获得较为可靠的资料,进一步对矿井储量和可采边界进行控制。
With the change of the coal production and construction phase,the only report of mine exploration are no longer meet the production requirements,which will then affect the design and production of the mine.Requirement on the division of reserves block and reserves category as well as degree of exploration is higher at this stage.According to the summary and analysis of actual geological conditions and metariels of lane inspection hole of Mengjin Coal Mine,more reliable information has been obtained,and then further to exercise control on the coal mine reserves and border of recoverable coalboundary.