摘要
在新建甬台温铁路客运专线某一跨河3×17m斜交刚构连续梁的工程实践中,对于跨河的刚构连续梁,采用贝雷桁架作为现浇支架,机械吊装操作,不仅降低了劳动强度,节约了工期,而且减少了施工成本,取得了显著的经济效益。
In the 3×17m skewed rigid continuous girders practice in newly built Yongtaiwen passenger special line, in allusion to continuous girders construction over river, the Bailey girder is used as cast-in-site scaffolding with mechanical lifting, so that the intensity of labour is reduced, the construction period is shortened, and the cost is reduced too, therefore the economic benefit is obvious.
出处
《交通标准化》
2009年第23期205-207,共3页
Communications Standardization
关键词
客运专线
斜交刚构连续梁
贝雷片支架
施工
special passenger line
skewed rigid continuous girder
Bailey support
construction