摘要
分析正压制粉系统煤仓下煤不畅的原因和对锅炉安全经济运行的影响,结合现有条件对煤仓进行改造、分段疏松,加强运行管理等措施,问题得以解决。说明了解决煤仓下煤不畅的重要意义。
Analyzed coal pulverizing system under positive-pressure of the bunker blocking problem,and its impact to the boiler on safty and economic operation.Measures are taken to solve this problem by reconstructing the bunker,dredging segmentally,reinforcing the management etc.Indicated the significance of solving this problem.
出处
《华中电力》
2009年第6期75-77,80,共4页
Central China Electric Power
关键词
正压制粉系统
下煤不畅
火电厂
positive-pressure pulverizing system
stuck bunder problem
thermal power plant