摘要
总结了平煤建工集团建井三处在四矿三水平进风井超千米立井二次提绞改装时解决稳绳张紧的方法,对矿井临时提绞有借鉴意义。
An introduction is made to the method adopted by the No.3 Shaft Sinking Division of Pingmei Construction Engineering Group for kibble guide-rope tensioning in the secondary remolding of the over 1000-m deep downcast shaft at the 3 -rd-level of the No.4 mine. The method adopted may serve as a reference for temporary mine hoisting operations