摘要 为求解多产品环境下带顺序相关调整时间(成本)的递阶生产计划问题,提出了一个两层模型。上层的综合生产计划模型求得各产品类在各时段的生产计划,下层的族分解模型则将上层得到的计划分解到所属的各产品族。为避免当族分解模型中各产品族间的调整时间较大时,上层得到的综合计划不可行,将调整上层计划所带来的额外费用集成到族分解模型的目标函数中,从而可以最优地调整得到综合计划。最后,利用某模具制造企业的数据进行了验证,结果表明,所提出的递阶生产计划模型比整体的方法求解规模小,比传统的递阶生产计划模型的成本低。 To solve the problem of Hierarchical Production Planning(HPP) with sequence-dependent setup in a multi-product environment,a two-tiered model,including Aggregate Production Planning(APP) and Family Disaggregation Planning(FDP),was proposed.The APP model was aimed to obtain the aggregate production plan of each product type in each period.In FDP model,the APP was disaggregated into the specific lot sizing plan and schedule for each product family.In order to avoid the infeasibility due to longer adjustment time for various product families,the extra costs arising from the adjustment of APP were integrated into the objective function of FDP model so as to obtain the optimal adjustment plans.The performance of the adjustment was validated with data from a mould manufacturing enterprise.The proposed HPP model reduced the solution scale compared to the monolithic approach and realized more cost savings than traditional HPP models.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2009年第12期2356-2362,共7页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(70771003 70521001) 新世纪优秀人才支持计划资助项目(NCET-04-0175)~~
关键词 多产品 递阶生产计划 综合生产计划 族分解计划 反馈 muti-product hierarchical production planning aggregate production planning family disaggregation planning feedback
  • 相关文献

参考文献14

  • 1MANNE A S. Programming of economic lot sizes[J]. Man agement Science,1958,4(2) :115- 135.
  • 2LASDON L S, TERJUNG R C. An efficient algorithm for multi-item scheduling[J].Operations Research, 1971,19 (4) : 949-969.
  • 3HAX A C, MEAL H C. Hierarchical integration of production planning and seheduling[M]. Amsterdam, the Netherlands: Elsevier, 1975.
  • 4NEUREUTHER B D, POLAK G G, SANDERS N R. A hier arehical production plan for a make-to-order steel fabrication plant[J]. Production Planning& Control, 2004, 15 (3) 324-335.
  • 5OMAR M K, TEO S C. Hierarchical production planning and scheduling in a multi-product, batch process environment[J]. International Journal of Production Research, 2007, 45 ( 5 ) : 1029-1047.
  • 6严洪森,蒋志坚.基于关联预测法的递阶生产计划与控制[J].控制理论与应用,1997,14(5):654-659. 被引量:2
  • 7刘琦,顾幸生.基于模糊规划的不确定性条件下递阶生产计划模型[J].信息与控制,2000,29(5):399-406. 被引量:7
  • 8彭频.现代制造系统递阶生产计划研究[J].中国钨业,2005,20(5):7-10. 被引量:3
  • 9OZDAMAR L, BOZYEL M A, BIRBIL S I. A hierarchical decision support system for production planning (with case study)[J].European Journal of Operational Research, 1998, 104(3) :403- 422.
  • 10SELCUK B, FRANSOO J C, DE KOK A G. The effect of updating lead times on the performance of hierarchical planning systems[J]. International Journal of Production Economics,2006,104(2) : 427-440.

二级参考文献10

  • 1胡燕海,马登哲,叶飞帆.制造系统通用作业计划与蚁群算法优化[J].计算机集成制造系统,2005,11(1):104-108. 被引量:14
  • 2方述诚,模糊数学与模糊优化,1997年
  • 3张伟,中国控制与决策学术年会论文集,1994年,873页
  • 4胡泽新,中国自动化学会首届过程控制科学报告会论文集,1987年,156页
  • 5Mehra A, Minis I. Hierarchical production planning for complex manufacturing systems [J]. Advances in Engineering Software, 1996,26:209-218.
  • 6Hax A C, Meal H C. Hierarchical integration of production planning and scheduling[A]. Geisler M A. Logistics[C].Amsterdam: North- Holland, 1975.53-69.
  • 7Anthony R N. Planning and Control System: A Framework For Analysis[M]. Boston: Harvard Business School Press,1965.
  • 8Kenneth N, Frank R, et al. A review of hierarchical production planning and its applicability for modern manufacturing[J]. Production Planning&Control, 1995, 6(5):384-394.
  • 9Gershwin S B. Hierarchical flow control: a framework for scheduling and planning discrete events in manufacturing systems[J]. Proceedings of the IEEE, 1989, 77(1): 195-209.
  • 10朱道立,武芳,龚国华.随机环境中的生产作业计划问题[J].管理科学学报,2001,4(5):50-57. 被引量:10

共引文献8