三峡地下电站上弯段双曲钢模台车有限元分析 被引量:8

The analysis and optimization of hyperbolic steel trolley on the upper bend section of the three gorges subsurface power station
下载PDF
导出
摘要 三峡地下电站引水隧洞上弯段属高速高压水流区,空间结构特殊,对衬砌混凝土质量要求高,因此本项目首次提出采用新型隧洞双曲钢模台车进行衬砌施工的方案。按照台车的浇筑顺序,对不同工况进行了有限元分析,完善了台车的结构设计,提高了双曲钢模台车的可靠性和使用寿命,为工程实践提供了较强的理论支撑。 The upper bend section of the water tunnel of the three gorges subsurface power station is a kind of area of high speed and high pressure. Because of its special spatial structure, the water tunnel requires high quality of lining concrete. According to this, this passage puts forwards new lining construction used by tunnel hyperbolic steel trolley. According to the order of pouring, for different conditions, we make some finite element analysis. This completes the structure design of steel trolley, improves the reliability of hyperbolic steel trolley and service life, so as to provide strong theory support for engineering practice.
出处 《机械设计与制造》 北大核心 2010年第1期70-72,共3页 Machinery Design & Manufacture
基金 三峡地下电站引水上弯段混凝土衬砌钢模台车(GXW/2008-08-02A)
关键词 三峡电站 上弯段 双曲钢模台车 有限元分析 The three gorges power station Upper bend section Hyperbolic steel trolley Finiteelement analysis
  • 相关文献

参考文献6

二级参考文献4

  • 1.水利水电工程施工组织设计手册(第5册)[M].北京:中国水利水电出版社,..
  • 2.模板与拱架的设计与安装[M].杭州:浙江科学技术出版社,..
  • 3朱佰芳.有限元法原理与应用(第2版)[M].北京:中国水利水电出版社,..
  • 4王明清.针梁式钢模台车在隧洞施工中的运用[J].云南水力发电,2008,24(6):58-60. 被引量:7

共引文献31

同被引文献33

引证文献8

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部