期刊文献+

模糊层次综合评判法在火电厂选址决策中的应用 被引量:9

Application of Fuzzy-AHP Model to the Decision-making of the Site Selection of Thermal Power Plant
下载PDF
导出
摘要 根据影响火电厂选址的因素较多、相互之间具有不确定性和模糊性这一特点,结合火电厂选址的实际情况,建立了火电厂选址综合效益评价指标体系;运用模糊层次综合评判法确定了各指标的权重分配;从可持续发展的角度对火电厂选址综合效益进行了评价;经过专家投票,将各因素层次化,得出模糊评价结果,即找到综合效益最好的厂址;并通过实例验证了该方法的可行性。可为火电厂决策者投资建设项目提供依据。 In combination with the actual situation of site selection of thermal power plant, the comprehensive benefits index system is established. There are numerous factors influencing the site selection, among which there are uncertainty and fuzziness. The comprehensive evaluation method based on the fuzzy analysis and Analytical Hierarchy Process (AHP) is used to evaluate the comprehensive benefits in the site selection of thermal power plant, with the consultation of experts. This paper contributes to the best selection of comprehensive benefits and provides the reference for the decision-making of building the thermal power plant on the part of sustainable development. Finally, an example is presented that demonstrates the feasibility of the approach.
出处 《安全与环境工程》 CAS 2010年第1期82-86,共5页 Safety and Environmental Engineering
关键词 模糊层次综合评判法 火电厂选址 综合效益评价 最优选址 Fuzzy AHP site selection of thermal power plant comprehensive benefit best site selection
  • 相关文献

参考文献9

二级参考文献23

共引文献525

同被引文献71

引证文献9

二级引证文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部