期刊文献+

基于GB5055—2008《计价规范》的工程造价管理研究 被引量:4

Project cost management based on GB5055-2008's Code of Valuation
下载PDF
导出
摘要 工程量清单计价虽然只是一种计价模式的改变,但其影响却决不仅仅在于工程造价的计算方法和确定过程,尤其是GB50500-2008《计价规范》的出台实施,计价模式的改革不仅对招投标制度和工程合同管理体系带来深远的影响,而且使全过程工程造价管理措施也发生了相应的变化。论文主要结合2008版《计价规范》主要特点及相关规定,着重阐述工程合同实施阶段的工程造价管理要点及相应管理措施。 Bill of quantities is a change of valuation mode and it affects more than calculation methods and decision making process. The reform of valuation mode has an impact on bidding system and construction contract management system and results in change of life cycle management measures for project cost particularly by the issue of Code of Valuation, GB50500-2008. Based on the characteristics and regulations of Code of Valuation, this paper clarified project cost management essentials in contract implementation phase and management measures.
作者 简红 张云波
出处 《建筑管理现代化》 2009年第6期514-517,共4页 Construction Management Modernization
关键词 清单计价 计价规范 造价管理 bill of quantities Code of Valuation Cost management
  • 相关文献

参考文献3

二级参考文献10

共引文献35

同被引文献15

引证文献4

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部