摘要
太平湾水电站位于丹东市上游,破坏性地震会导致洪水灾害和电力设施灾害。电厂建立健全了防震减灾组织机构,明确责任,建立了各种应急对策,防范未然。本文对此作一简要介绍。
Destructive earthquake may cause harm to power facilities and induce flood. Thus, related organizations were estab- lished and emergency plan was compiled to diminish the loss when earthquake happen.
出处
《大坝与安全》
2009年第4期12-15,共4页
Dam & Safety
关键词
防震减灾
组织与职责
对策
太平湾水电站
earthquake preparedness
organization and responsibility
counter-measure
Taipingwan hydropower station