摘要
根据蒲石河水电站重力坝的结构特点,设计了一种新型悬臂大钢模板,并对关键部件进行了分析计算,介绍了其施工工艺。针对施工中的难点问题,从悬臂模板结构设计和施工工艺两个方面提出了解决措施。
Based on the structure characteristics of gravity dam for Pushihe hydropower station,the paper designs a new type long cantilever form,analyzes and calculates the key parts of the form and introduces its construction technology.According to difficult problems of construction,the paper puts forward the solving measures from structure design and construction technology of cantilever form.
出处
《东北水利水电》
2010年第2期1-4,共4页
Water Resources & Hydropower of Northeast China
关键词
重力坝
悬臂钢模板
施工工艺
受力螺栓
蒲石河水电站
gravity dam
cantilever form
construction technology
bearing bolt
Pushihe hydropower station