摘要
描述工程进度拖延原因分析及解决措施,进度拖延原因分析可采取的方法和进度拖延主要由哪几方面构成及解决进度拖延的措施主要应考虑的几个方面:1)基本策略;2)工期压缩问题;3)可以采取的赶工措施;4)压缩对象的合理选择。
this paper describes the analysis of the reasons for the project progress delay and its solutions, including the methods for analyzing progress delay, the causes of progress delay and different aspects for resolving the delay, which are 1) the basic strategy, 2) duration compression issue, 3) the measures to accelerate the progress, and 4) the reasonable choi
出处
《福建建筑》
2010年第2期144-146,共3页
Fujian Architecture & Construction
关键词
进度拖延
原因分析
解决措施
Progress delay
Cause analysis
Countermeasures