摘要 采用岩石力学原理和方法,通过现场初始地应力实测、室内岩石力学性质试验和矿床开采全过程的三维有限元模拟,系统地分析了大团山矿床开采过程中采空区顶底板和矿柱的稳定性。结果表明,矿柱宽度小于27.5m时,矿柱将会发生失稳,增加矿柱宽度对采空区顶底板稳定性的影响并不明显。据此进一步提出了一套合理的空区处理方法。 The stability of rock around mined caverns and safety pillar was analyzed with the measurement of in situ stresses and laboratory tests of mechanical properties of rocks as well as 3D FEM simulation of the whole course of mining based on rock mechanics principle. It was clarified that vertical safety pillar would become unstable when its width is less than 27.5 m and enlarging the width of the pillar can not improve the stability of hanging wall and footwall significantly. A rational support method was proposed based on the simulation results. The conclusions have been adopted by mining design and production of the deposit.
出处 《中国有色金属学报》 EI CAS CSCD 北大核心 1998年第4期734-738,共5页 The Chinese Journal of Nonferrous Metals
基金 国家自然科学基金
关键词 采空区 有限元 矿柱 铜矿床 采矿 mined cavern support 3D finite element method pillar reinforcement
  • 相关文献

参考文献1

二级参考文献2

  • 1朱维申,围岩稳定及控制方法新进展,1992年
  • 2于学馥,信息时代岩土力学与采矿计算初步,1991年

共引文献2

同被引文献73

引证文献10

二级引证文献181

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部