摘要
结合龙厦线实际情况,针对铁路双洞单线隧道区段的GSM-R无线设计方案进行分析,将隧道结构和方案进行结合,提出了新的覆盖方案,既节约了投资,也减少了将来的维护工作量,可为类似工程提供借鉴。
Based on the experience on Longyan -Xiamen railway line, this article proposes a new GSM-R coverage solution within a double tunnel district with single track after the analysis of its RF design, which fully takes the tunnel construction and the solution features into consideration. The solution will reduce future workload of maintenance and save investment, serving as a successful case for similar projects.
出处
《铁道通信信号》
2010年第1期59-61,共3页
Railway Signalling & Communication