明珠大厦后浇带的设计与施工

DESIGN AND CONSTRUCTION OF POST-POURING BAND OF MINGZHU BUILDING
下载PDF
导出
摘要 后浇带用于解决主楼与低层裙房间的沉降差,保证结构整体性等问题。施工期间需要根据有关规定及工程实际情况合理布置后浇带,并采取可靠的施工技术措施,以确保后浇带的质量。本文介绍了泰安市明珠大厦后浇带的设计及施工等情况,供有关技术人员借鉴。 Post-pouring band was used to address the main building and the lower skirts of the settlement room poor,to ensure the structural integrity and so on.The post-pouring band should be reasonably constructed based on the regulation and the actual situation,and it should be streng thened by reliable method to ensure the quality.This paper introduces the design and construction of post-pouring band of Mingzhu Building of Taian City,to provide efeirence for the technicians.
出处 《山东农业大学学报(自然科学版)》 CSCD 北大核心 2010年第1期106-108,共3页 Journal of Shandong Agricultural University:Natural Science Edition
关键词 明珠大厦 后浇带 技术措施 Mingzhu buildng post-pouring band technology measures
  • 相关文献

参考文献5

二级参考文献5

  • 1GB50204-2002.混凝土结构工程施工质量验收规范[S].[S].,2002..
  • 2GB50010-2002.混凝土结构设计规范[S].[S].,..
  • 3JGJ3-2002.高层建筑混凝土结构技术规程[S].[S].,..
  • 4GB 50010-220,混凝土结构设计规范[S].
  • 5J 186-2002,高层建筑混凝土结构技术规程[S].

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部